Notices
Asbestos Management Plan
On a semi-annual basis, a walk-through inspection of each building that contains Asbestos-Containing Building Material (ACBM) or assumed ACBM should be undertaken by the direction of the Local Educational Agencies (LEA) every six (6) months. This surveillance is required under the 40 CFR 763 USEPA Asbestos Hazard Emergency Response Act (AHERA)